LETTING OF OCTOBER 03, 2008 ENG. EST. LOW BID PROPOSAL 0810001 $ 22,043,074.91 $ 22,372,839.07 PROJECT IM 47064-78200 , ETC LOCAL AGRMT. % OVER/UNDER EST. START DATE - MARCH 01, 2009 COMPLETION DATE - SEPTEMBER 19, 2011 1.50 % 3.84 mi of hot mix asphalt cold milling and resurfacing, mainline shoulder widening, guardrail, reconstruction of six ramps, drainage improvements, freeway signing, reconstruction of carpool lot, right-of-way fence replacement, bridge replacement and rehabilitation including deep overlay, rail replacement, painting, pin and hanger and substructure repairs on I-96 from east of US-23 easterly to the Livingston/Oakland County line, on Kensington Road and on Pleasant Valley Road over I-96, Livingston and Oakland Counties. This project includes three 5 year materials and workmanship pavement warranties and a 2 year bridge painting warranty. 10.00 % DBE participation required BIDDER AS-SUBMITTED Six-S, Inc./D.O.C. Contracting, Inc. $ 22,372,839.07 1 ** C. A. Hull Co., Inc. $ 22,449,684.28 2 Dan's Excavating, Inc. $ 22,657,319.71 3 Cadillac Asphalt, LLC. $ 22,857,154.47 4 Ajax Paving Industries, Inc. $ 23,193,331.58 5 Walter Toebe/Angelo Iafrate Const. $ 23,849,564.04 6 C & D Hughes, Inc. $ 24,205,799.99 7 Fisher Contracting Company Anlaan Corporation Milbocker and Sons, Inc. Posen Construction, Inc. Aggregate Industries-Central Region Barrett Paving Materials, Inc. Angelo Iafrate Construction Company D.J. McQuestion & Sons, Inc. 7 Bidders LETTING OF OCTOBER 03, 2008 ENG. EST. LOW BID PROPOSAL 0810002 $ 292,900.00 $ 288,931.00 PROJECT STH 63609-100366 LOCAL AGRMT. 08-5377 % OVER/UNDER EST. START DATE - 10 days after award COMPLETION DATE - SEPTEMBER 17, 2009 -1.36 % Traffic signal upgrades with box span installation at 3 intersections on Southfield Road from 10 Mile Road northerly to 11 Mile Road in the cities of Lathrop Village and Southfield, Oakland County. BIDDER AS-SUBMITTED Metropolitan Power & Lighting, Inc. $ 288,931.00 1 ** Rauhorn Electric, Inc. $ 298,998.41 2 J. Ranck Electric, Inc. $ 316,143.18 3 Alpha Electric, Inc. $ 318,755.69 4 Posen Construction, Inc. $ 342,266.60 5 Motor City Electric Utilities Co. $ 360,320.95 6 Severance Electric Co., Inc. Windemuller Electric, Inc. Trans Tech Electric, L.P. 6 Bidders LETTING OF OCTOBER 03, 2008 ENG. EST. LOW BID PROPOSAL 0810003 $ 6,243,373.31 $ 6,698,400.87 PROJECT NH 52041-80145 , ETC LOCAL AGRMT. % OVER/UNDER EST. START DATE - 10 days after award COMPLETION DATE - OCTOBER 20, 2009 7.29 % 3.02 mi of roadway reconstruction and realignment, drainage improvements, guardrail upgrading, and pavement markings on US-41/M-28 from Brown Road westerly to the Marquette/Baraga County line, Marquette County. This project includes a 5 year materials and workmanship pavement warranty. 5.00 % DBE participation required BIDDER AS-SUBMITTED Bacco Construction Company $ 6,698,400.87 1 ** M & M Excavating Co., Inc. $ 7,495,261.05 2 A. Lindberg & Sons, Inc. $ 7,922,808.14 3 James Peterson Sons, Inc. $ 8,304,378.92 4 Musson Bros., Inc. $ 8,842,738.14 5 Barley Trucking & Excavating, Inc. MJO Contracting, Inc. Oberstar, Inc. Hebert Construction Company 5 Bidders LETTING OF OCTOBER 03, 2008 ENG. EST. LOW BID PROPOSAL 0810004 $ 2,002,953.77 $ 1,679,500.34 PROJECT EDAF 63522-100992 LOCAL AGRMT. 08-5381 % OVER/UNDER EST. START DATE - 10 days after award COMPLETION DATE - JUNE 15, 2009 -16.15 % 1.01 mi of drainage structure and sewer work, concrete patches, repairs, pavement overlay, sidewalk, and ADA ramps, and guardrail on South Boulevard from Martin Luther King Boulevard to Opdyke Road in the city of Pontiac, Oakland County. 10.00 % DBE participation required BIDDER AS-SUBMITTED Six-S, Inc. $ 1,679,500.34 1 ** Florence Cement Company $ 1,817,402.32 2 John Carlo, Inc. $ 1,978,344.54 3 Dan's Excavating, Inc. $ 1,983,479.00 4 Angelo Iafrate Construction Company $ 2,031,919.91 5 Ajax Paving Industries, Inc. $ 2,082,744.54 6 Posen Construction, Inc. $ 2,172,341.41 7 C & D Hughes, Inc. $ 2,297,347.40 8 Tony Angelo Cement Construction Comp Kelcris Corporation 8 Bidders LETTING OF OCTOBER 03, 2008 ENG. EST. LOW BID PROPOSAL 0810005 $ 95,655.25 $ 82,754.13 PROJECT CMG 46400-101647 LOCAL AGRMT. 08-5353 % OVER/UNDER EST. START DATE - 10 days after award COMPLETION DATE - AUGUST 03, 2009 -13.49 % Traffic and pedestrian signal upgrade on Tecumseh River Road at Franklin Street in the village of Clinton, Lenawee County. BIDDER AS-SUBMITTED J R Howell Airport Lighting LLC $ 82,754.13 1 ** J. Ranck Electric, Inc. $ 89,028.09 2 DVT Electric, Inc $ 90,937.90 3 Rauhorn Electric, Inc. $ 91,484.83 4 Trans Tech Electric, L.P. $ 93,779.45 5 Metropolitan Power & Lighting, Inc. $ 138,625.60 6 Severance Electric Co., Inc. Windemuller Electric, Inc. 6 Bidders LETTING OF OCTOBER 03, 2008 PROPOSAL 0810006 PROJECT STT 77012-75165, ETC LOCAL AGRMT. START DATE - JULY 06, 2009 COMPLETION DATE - MAY 29, 2010 3.80 mi of hot mix asphalt cold milling and resurfacing, deck patching, epoxy overlay and joints on two bridges, bridge replacement, and approach work on M-19 from Bryce Road northerly to south of Metcalf Road, over Emmett and Sullivan Drains, over Mill Creek, and over Pine River, St. Clair County. This project includes a 5 year materials and workmanship pavement warranty and a 3 year pavement performance warranty. 10.00 % DBE participation required POSTPONED LETTING OF OCTOBER 03, 2008 ENG. EST. LOW BID PROPOSAL 0810007 $ 1,324,523.78 $ 1,347,855.69 PROJECT BHT 03041-86779 , ETC LOCAL AGRMT. % OVER/UNDER EST. START DATE - APRIL 13, 2009 COMPLETION DATE - AUGUST 18, 2009 1.76 % Bridge rehabilitation including deep concrete overlay, pin and hanger and railing replacement, structural steel repair, full paint, concrete beam end repair, approach work and maintaining traffic on M-89 over I-196/US-31 and on M-222 over the Kalamazoo River in the city of Allegan, Allegan County. This project includes a 2 year bridge painting warranty. 5.00 % DBE participation required BIDDER AS-SUBMITTED C. A. Hull Co., Inc. $ 1,347,855.69 1 ** J. Slagter & Son Construction Co. $ 1,387,712.49 2 L.W. Lamb, Inc. $ 1,417,101.85 3 Anlaan Corporation $ 1,479,041.70 4 Midwest Bridge Company $ 1,655,378.01 5 Hardman Construction, Inc. Walter Toebe Construction Co. 5 Bidders LETTING OF OCTOBER 03, 2008 ENG. EST. LOW BID PROPOSAL 0810008 $ 803,394.42 $ 797,918.00 PROJECT NH 28011-103213 LOCAL AGRMT. % OVER/UNDER EST. START DATE - SEPTEMBER 14, 2009 COMPLETION DATE - 15 working days -0.68 % 5.47 mi of cold milling and resurfacing, joint and shoulder repairs on US-31 from east of Sullivan Road westerly to west of the Grand Traverse/Benzie County line, Grand Traverse and Benzie Counties. This project includes a 3 year pavement performance warranty. A 2009 highway preventive maintenance project. BIDDER AS-SUBMITTED Elmer's Crane & Dozer, Inc. $ 797,918.00 1 ** Rieth-Riley Construction Co., Inc. $ 915,623.30 2 2 Bidders LETTING OF OCTOBER 03, 2008 ENG. EST. LOW BID PROPOSAL 0810009 $ 541,812.00 $ 515,657.50 PROJECT ST 84913-102902 LOCAL AGRMT. % OVER/UNDER EST. START DATE - 10 days after award COMPLETION DATE - JUNE 08, 2009 -4.83 % 94.43 mi of overband crack fill at various locations in the cities of Kentwood and Grand Rapids and in the village of Kent City, Kent and Ottawa Counties. A 2009 highway preventive maintenance project. BIDDER AS-SUBMITTED Scodeller Construction, Inc. $ 515,657.50 1 ** Interstate Sealant & Concrete, Inc. $ 527,441.21 2 Michigan Joint Sealing, Inc. Fahrner Asphalt Sealers, LLC. Superior Chip Sealing & Maintenance, 2 Bidders LETTING OF OCTOBER 03, 2008 ENG. EST. LOW BID PROPOSAL 0810010 $ 340,158.07 $ 263,426.69 PROJECT STG 55031-85130 LOCAL AGRMT. % OVER/UNDER EST. START DATE - 10 days after award COMPLETION DATE - NOVEMBER 07, 2009 -22.56 % 77.96 mi of non-freeway sign replacement on M-35 from the US-41 junction in the city of Menominee northerly to the Delta/Marquette County line in the cities of Menominee, Escanaba, and Gladstone, Delta and Menominee Counties. BIDDER AS-SUBMITTED Action Traffic Maintenance, Inc. $ 263,426.69 1 ** Give 'em A Brake Safety $ 274,579.13 2 Sterling Sign Co. Inc. $ 281,960.00 3 J & J Contracting, Inc. $ 288,710.65 4 J. Ranck Electric, Inc. $ 307,773.99 5 Bridge-Tec Services, Corp. $ 309,644.70 6 Trans Tech Electric, L.P. $ 315,780.50 7 GFS Fence, Guardrail & Signage, Inc. $ 468,225.44 8 Highway Service Company, Inc. Midwest Bridge Company 8 Bidders LETTING OF OCTOBER 03, 2008 ENG. EST. LOW BID PROPOSAL 0810011 $ 168,398.54 $ 134,277.01 PROJECT STT 62032-90092 LOCAL AGRMT. % OVER/UNDER EST. START DATE - MAY 04, 2009 COMPLETION DATE - 15 working days -20.26 % 17.05 mi of hot mix asphalt crack treatment on M-37 from north of 3 Mile Road northerly to north of 18 Mile Road at the Newaygo/Lake County line, Newaygo County. This project includes a 2 year pavement performance warranty. A 2009 highway preventive maintenance project. BIDDER AS-SUBMITTED Causie Contracting, Inc. $ 134,277.01 1 ** Interstate Sealant & Concrete, Inc. $ 143,759.91 2 Michigan Joint Sealing, Inc. $ 155,277.16 3 Superior Chip Sealing & Maintenance, $ 169,614.10 4 Scodeller Construction, Inc. $ 170,102.16 5 Fahrner Asphalt Sealers, LLC. $ 183,476.91 6 6 Bidders LETTING OF OCTOBER 03, 2008 ENG. EST. LOW BID PROPOSAL 0810012 $ 977,999.35 $ 843,754.44 PROJECT CM 41031-100579 LOCAL AGRMT. % OVER/UNDER EST. START DATE - 10 days after award COMPLETION DATE - AUGUST 21, 2009 -13.73 % 0.34 mi of hot mix asphalt indirect left and right turn lane construction, storm sewer, concrete curb and gutter on M-37 at the 76th Street intersection, Kent County. This project includes a 5 year materials and workmanship pavement warranty. 5.00 % DBE participation required BIDDER AS-SUBMITTED Kamminga & Roodvoets, Inc. $ 843,754.44 1 ** Schippers Excavating, Inc. $ 894,495.55 2 D.J. McQuestion & Sons, Inc. $ 894,969.61 3 Nagel Construction, Inc. $ 900,405.91 4 Peters Construction Co. $ 907,051.49 5 Bultema Brothers Road Contractors, I $ 908,910.38 6 Kentwood Excavating, Inc. $ 915,353.25 7 CL Trucking & Excavating, LLC. $ 923,902.70 8 Brenner Excavating, Inc. $ 926,733.00 9 Nashville Construction Company $ 927,362.72 10 Dykema Excavators, Inc. $ 930,174.86 11 Milbocker and Sons, Inc. $ 933,567.86 12 Kalin Construction Co., Inc. $ 937,598.49 13 Davis Construction, Inc. $ 945,231.60 14 Diversco Construction Company Inc $ 967,068.78 15 C & D Hughes, Inc. $ 1,052,333.66 16 Lodestar Construction, Inc. $ 1,299,872.85 17 17 Bidders LETTING OF OCTOBER 03, 2008 ENG. EST. LOW BID PROPOSAL 0810013 $ 5,865,622.64 $ 6,049,104.18 PROJECT HPSL 50099-88933 LOCAL AGRMT. 08-5400 % OVER/UNDER EST. START DATE - 10 days after award COMPLETION DATE - OCTOBER 15, 2009 3.13 % 1.50 mi of concrete pavement construction including pavement removal, station grading, subgrade undercutting, sand subbase, aggregate base, storm sewer and drainage improvements, concrete curb and gutter, traffic signals, and pavement markings on Romeo Plank Road from Hall Road (M-59) northerly to north of 21 Mile Road, Macomb County. 12.00 % DBE participation required BIDDER AS-SUBMITTED Dan's Excavating, Inc. $ 6,049,104.18 1 ** Six-S, Inc. $ 6,157,287.45 2 Florence Cement Company $ 6,254,624.26 3 Pamar Enterprises, Inc. $ 6,316,288.05 4 John Carlo, Inc. $ 6,382,849.51 5 DiPonio Contracting, Inc. $ 6,584,420.30 6 Stante Excavating Co., Inc. $ 6,595,220.32 7 Ajax Paving Industries, Inc. $ 6,634,951.80 8 Angelo Iafrate Construction Company $ 6,771,168.95 9 V.I.L. Construction, Inc. $ 6,778,631.28 10 Zito Construction Co. $ 6,920,149.80 11 DeAngelis Landscape, Inc. Fisher Contracting Company ABC Paving Company B&V Construction, Inc. T. R. Pieprzak Co. 11 Bidders LETTING OF OCTOBER 03, 2008 ENG. EST. LOW BID PROPOSAL 0810014 $ 3,847,929.50 $ 4,158,365.40 PROJECT FFH 02012-58732 , ETC LOCAL AGRMT. 08-5351 % OVER/UNDER EST. START DATE - 10 days after award COMPLETION DATE - OCTOBER 15, 2009 8.07 % 12.74 mi of embankment, subbase, aggregate base, approaches, culverts, hot mix asphalt paving, traffic control, and slope restoration on Round Lake Road (County Road 440) from Federal Forest Highway-13 to the Delta County line and from County Road 509 to the Alger County line, Alger and Delta Counties. BIDDER AS-SUBMITTED M & M Excavating Co., Inc. $ 4,158,365.40 1 ** Oberstar, Inc. $ 4,173,603.15 2 D.J. McQuestion & Sons, Inc. $ 4,244,955.49 3 Hebert Construction Company $ 4,367,328.41 4 Bacco Construction Company $ 4,371,286.43 5 Payne & Dolan, Inc. $ 4,514,338.72 6 James Peterson Sons, Inc. $ 5,402,003.66 7 A. Lindberg & Sons, Inc. Cordes Excavating, Inc. Barley Trucking & Excavating, Inc. Musson Bros., Inc. Mathy Construction Company 7 Bidders LETTING OF OCTOBER 03, 2008 ENG. EST. LOW BID PROPOSAL 0810015 $ 2,315,115.78 $ 1,947,691.00 PROJECT MCS 09015-89190 , ETC LOCAL AGRMT. 08-5386 % OVER/UNDER EST. START DATE - JANUARY 02, 2009 COMPLETION DATE - MARCH 15, 2009 -15.87 % Bridge rehabilitation including painting and weld repairs on Woodside Avenue and Truman Parkway at Saginaw River in the city of Bay City, Bay County. BIDDER AS-SUBMITTED Central Painting, Inc. $ 1,947,691.00 1 ** Venus Painting Co. $ 1,984,076.00 2 Atsalis Brothers Painting Company $ 2,083,292.00 3 Icarus Industrial Painting & Contrac $ 2,168,366.00 4 Abhe & Svoboda, Inc. $ 4,271,310.00 5 Three Star Painting, Inc. Seaway Painting, LLC 5 Bidders LETTING OF OCTOBER 03, 2008 ENG. EST. LOW BID PROPOSAL 0810016 $ 1,164,374.60 $ 952,927.09 PROJECT MCS 41025-89423 LOCAL AGRMT. 08-5383 % OVER/UNDER EST. START DATE - 10 days after award COMPLETION DATE - MAY 29, 2009 -18.16 % Bridge rehabilitation including concrete deck overlay, joint, pin and hanger, and railing replacement, partial painting of structural steel, approach work and maintaining traffic on Wealthy Street over the Grand River in the city of Grand Rapids, Kent County. BIDDER AS-SUBMITTED J. Slagter & Son Construction Co. $ 952,927.09 1 ** Anlaan Corporation $ 993,625.69 2 C. A. Hull Co., Inc. $ 998,972.85 3 Davis Construction, Inc. $ 1,102,411.22 4 Midwest Bridge Company $ 1,327,331.20 5 Abhe & Svoboda, Inc. L.W. Lamb, Inc. Walter Toebe Construction Co. 5 Bidders LETTING OF OCTOBER 03, 2008 ENG. EST. LOW BID PROPOSAL 0810017 $ 881,896.25 $ 760,070.98 PROJECT STL 39091-76624 LOCAL AGRMT. 08-5371 % OVER/UNDER EST. START DATE - 10 days after award COMPLETION DATE - JUNE 26, 2009 -13.81 % 1.07 mi of hot mix asphalt crushing, shaping, and resurfacing, reconstruction and alignment, earthwork, clearing, drainage, pavement markings, and restoration on 44th Street from R Avenue to Q Avenue, Kalamazoo County. 7.00 % DBE participation required BIDDER AS-SUBMITTED Brenner Excavating, Inc. $ 760,070.98 1 ** Hoffman Bros., Inc. $ 773,000.11 2 Robert Bailey Contractors, Inc. $ 813,000.00 3 Kalin Construction Co., Inc. $ 827,814.61 4 Milbocker and Sons, Inc. $ 833,527.85 5 Balkema Excavating, Inc. $ 834,250.23 6 Peters Construction Co. $ 836,582.36 7 D.J. McQuestion & Sons, Inc. $ 842,520.40 8 Michigan Paving & Materials Co. $ 842,833.26 9 Northern Construction Services, Corp $ 897,672.65 10 Nashville Construction Company $ 913,943.50 11 Kamminga & Roodvoets, Inc. $ 929,437.29 12 Bultema Brothers Road Contractors, I Aggregate Industries-Central Region Burkett Excavating CL Trucking & Excavating, LLC. 12 Bidders LETTING OF OCTOBER 03, 2008 ENG. EST. LOW BID PROPOSAL 0810018 $ 203,676.25 $ 162,712.50 PROJECT EDD 14555-83558 LOCAL AGRMT. 08-5372 % OVER/UNDER EST. START DATE - 10 days after award COMPLETION DATE - 30 working days -20.11 % 0.12 mi of storm sewer, machine grading, concrete curb, gutter, and sidewalks, hot mix asphalt paving, and pavement markings on South Rowland Street from Jefferson Street to State Street in the village of Cassopolis, Cass County. BIDDER AS-SUBMITTED Northern Construction Services, Corp $ 162,712.50 1 ** Kalin Construction Co., Inc. $ 174,012.61 2 Hoffman Bros., Inc. $ 184,900.44 3 R. Smith & Sons Trucking, Inc. $ 187,734.25 4 Selge Construction Co., Inc. $ 187,918.15 5 Concord Excavating & Grading, Inc. $ 193,038.10 6 Peters Construction Co. $ 193,684.00 7 Milbocker and Sons, Inc. $ 195,980.00 8 Nashville Construction Company $ 201,762.10 9 Kamminga & Roodvoets, Inc. $ 210,951.75 10 Eastlund Concrete Construction, Inc. $ 237,848.10 11 Brenner Excavating, Inc. Burkett Excavating Balkema Excavating, Inc. 11 Bidders LETTING OF OCTOBER 03, 2008 PROPOSAL 0810019 PROJECT STT 08033-103157 LOCAL AGRMT. START DATE - JULY 13, 2009 COMPLETION DATE - AUGUST 28, 2009 31.59 mi of overband crack filling and chip sealing on M-179 from west of US-131 easterly to M-43, gapping out the railroad crossing and approaches, and on M-89 from west of I-196 easterly to M-40 including the ramps at M-89 and I-196 and gapping out the bridge approach over I-196 in the village of Bradley, city of Fennville, Allegan and Barry Counties. This project includes a 2 year pavement performance warranty. A 2009 highway preventive maintenance project. **ALL BIDS REJECTED. THIS PROJECT IS EXPECTED TO BE RE-LET IN A FUTURE LETTING** LETTING OF OCTOBER 03, 2008 ENG. EST. LOW BID PROPOSAL 0810020 $ 1,750,954.10 $ 1,955,309.53 PROJECT STT 76062-79205-2 LOCAL AGRMT. % OVER/UNDER EST. START DATE - JULY 06, 2009 COMPLETION DATE - OCTOBER 30, 2009 11.67 % Structure replacements and approach work at 2 structures on M-21 over Crawford County Drain and over Limbarg County Drain, Shiawassee County. 5.00 % DBE participation required BIDDER AS-SUBMITTED Davis Construction, Inc. $ 1,955,309.53 1 ** Hardman Construction, Inc. $ 2,159,354.67 2 E.T. MacKenzie Company $ 2,189,531.01 3 Milbocker and Sons, Inc. $ 2,211,084.28 4 C. A. Hull Co., Inc. $ 2,416,114.52 5 Anlaan Corporation $ 2,420,000.00 6 J.E. Kloote Contracting, Inc. $ 2,726,270.55 7 Posen Construction, Inc. $ 2,731,292.49 8 L.W. Lamb, Inc. S.L. & H. Contractors, Inc. J. Slagter & Son Construction Co. Walter Toebe Construction Co. 8 Bidders LETTING OF OCTOBER 03, 2008 ENG. EST. LOW BID PROPOSAL 0810021 $ 1,655,809.39 $ 1,850,472.12 PROJECT ST 80042-103171 LOCAL AGRMT. % OVER/UNDER EST. START DATE - JUNE 16, 2009 COMPLETION DATE - AUGUST 22, 2009 11.76 % 11.11 mi of overband crack filling, paver placed surface sealing, and centerline corrugations on M-43 from the east city limits of Bangor easterly to west of M-40, Van Buren County. This project includes a 3 year pavement performance warranty. A 2009 highway preventive maintenance project BIDDER AS-SUBMITTED Rieth-Riley Construction Co., Inc. $ 1,850,472.12 1 ** Michigan Paving & Materials Co. $ 1,889,697.15 2 Aggregate Industries-Central Region $ 2,131,494.15 3 3 Bidders LETTING OF OCTOBER 03, 2008 ENG. EST. LOW BID PROPOSAL 0810022 $ 414,484.30 $ 298,678.00 PROJECT ST 84914-103249 LOCAL AGRMT. % OVER/UNDER EST. START DATE - MAY 11, 2009 COMPLETION DATE - JUNE 18, 2009 -27.94 % 99.10 mi of hot mix asphalt crack treatment on various state trunkline routes, Bay, Clare, Gladwin, Gratiot, and Saginaw Counties. This project includes a 2 year pavement performance warranty. A 2009 highway preventive maintenance project. BIDDER AS-SUBMITTED Scodeller Construction, Inc. $ 298,678.00 1 ** Interstate Sealant & Concrete, Inc. $ 313,554.40 2 Superior Chip Sealing & Maintenance, $ 528,677.04 3 Fahrner Asphalt Sealers, LLC. $ 601,841.42 4 Michigan Joint Sealing, Inc. 4 Bidders LETTING OF OCTOBER 03, 2008 ENG. EST. LOW BID PROPOSAL 0810023 $ 385,351.00 $ 265,746.20 PROJECT ST 84914-102567 LOCAL AGRMT. % OVER/UNDER EST. START DATE - JULY 06, 2009 COMPLETION DATE - AUGUST 07, 2009 -31.04 % 56.67 mi of hot mix asphalt crack treatment on M-25, M-46, M-138, M-15, M-24, and M-81 at various locations, Huron, Sanilac and Tuscola Counties. This project includes a 2 year pavement performance warranty. A 2009 highway preventive maintenance project. BIDDER AS-SUBMITTED Causie Contracting, Inc. $ 265,746.20 1 ** Interstate Sealant & Concrete, Inc. $ 328,615.80 2 Fahrner Asphalt Sealers, LLC. $ 329,850.30 3 Scodeller Construction, Inc. $ 332,683.00 4 Superior Chip Sealing & Maintenance, $ 383,819.01 5 Michigan Joint Sealing, Inc. 5 Bidders LETTING OF OCTOBER 03, 2008 ENG. EST. LOW BID PROPOSAL 0810024 $ 358,841.00 $ 283,737.00 PROJECT STT 84913-51097 LOCAL AGRMT. % OVER/UNDER EST. START DATE - SEPTEMBER 08, 2009 COMPLETION DATE - 20 working days -20.93 % 51.16 mi of hot mix asphalt crack treatment on M-50, M-21, M-46, M-66, M-91, and Old US-131 in the villages of Lake Odessa, Muir, Pewamo, Amble, Lakeview, Morley, and Stanwood, Ionia, Montcalm, and Mecosta Counties. This project includes a 2 year pavement performance warranty. A 2009 highway preventive maintenance project. BIDDER AS-SUBMITTED Scodeller Construction, Inc. $ 283,737.00 1 ** Causie Contracting, Inc. $ 337,078.11 2 Interstate Sealant & Concrete, Inc. $ 342,684.40 3 Fahrner Asphalt Sealers, LLC. $ 366,188.84 4 Superior Chip Sealing & Maintenance, $ 371,608.33 5 Michigan Joint Sealing, Inc. 5 Bidders LETTING OF OCTOBER 03, 2008 ENG. EST. LOW BID PROPOSAL 0810025 $ 277,973.43 $ 322,742.94 PROJECT STH 82121-80378 LOCAL AGRMT. 08-5309 % OVER/UNDER EST. START DATE - 10 days after award COMPLETION DATE - SEPTEMBER 19, 2010 16.11 % 0.09 mi of safety improvements including radii improvements, addition of right turn lane, hot mix asphalt paving, signal replacement, hydrant relocation and ADA sidewalk ramp improvements on M-5 (Grand River Avenue) at Lahser Road in the city of Detroit, Wayne County. 7.00 % DBE participation required BIDDER AS-SUBMITTED J. Ranck Electric, Inc. $ 322,742.94 1 ** Motor City Electric Utilities Co. $ 323,395.14 2 Alpha Electric, Inc. $ 326,975.40 3 Rauhorn Electric, Inc. $ 361,853.27 4 Severance Electric Co., Inc. Windemuller Electric, Inc. Metropolitan Power & Lighting, Inc. Posen Construction, Inc. 4 Bidders LETTING OF OCTOBER 03, 2008 ENG. EST. LOW BID PROPOSAL 0810026 $ 419,231.97 $ 363,403.13 PROJECT EBSL 67031-103351 LOCAL AGRMT. % OVER/UNDER EST. START DATE - MAY 11, 2009 COMPLETION DATE - 9 working days -13.32 % 8.78 mi of overband crack filling and single course chip sealing on M-66 from north of US-10 northerly to south of M-115, Osceola County. This project includes a 2 year pavement performance warranty. A 2009 highway preventive maintenance project. BIDDER AS-SUBMITTED Superior Chip Sealing & Maintenance, $ 363,403.13 1 ** Fahrner Asphalt Sealers, LLC. $ 373,327.69 2 Highway Maintenance and Const. Co. $ 398,284.33 3 Michigan Pavement Solutions LLC $ 424,691.95 4 4 Bidders LETTING OF OCTOBER 03, 2008 ENG. EST. LOW BID PROPOSAL 0810027 $ 254,710.00 $ 227,056.88 PROJECT EBSL 84912-103349 LOCAL AGRMT. % OVER/UNDER EST. START DATE - APRIL 04, 2009 COMPLETION DATE - 20 working days -10.86 % 40.87 mi of hot mix asphalt crack treatment on various state trunkline routes, Manistee, Mason, Missaukee, Osceola, and Wexford Counties. This project includes a 2 year pavement performance warranty. A 2009 highway preventive maintenance project. BIDDER AS-SUBMITTED Scodeller Construction, Inc. $ 227,056.88 1 ** Superior Chip Sealing & Maintenance, $ 256,577.10 2 Interstate Sealant & Concrete, Inc. $ 299,507.40 3 Fahrner Asphalt Sealers, LLC. $ 352,101.56 4 Michigan Joint Sealing, Inc. 4 Bidders LETTING OF OCTOBER 03, 2008 ENG. EST. LOW BID PROPOSAL 0810028 $ 1,012,805.50 $ 1,008,004.33 PROJECT STUL 38409-83301 LOCAL AGRMT. 08-5324 % OVER/UNDER EST. START DATE - 10 days after award COMPLETION DATE - AUGUST 07, 2009 -0.47 % 0.41 mi of pavement removal, storm sewer, hot mix asphalt, traffic signal, and watermain construction on Wildwood Avenue from Daniel Street to North West Avenue in the city of Jackson, Jackson County. 5.00 % DBE participation required BIDDER AS-SUBMITTED Bailey Excavating, Inc. $ 1,008,004.33 1 ** Concord Excavating & Grading, Inc. $ 1,019,906.36 2 Davis Construction, Inc. $ 1,082,823.55 3 Peters Construction Co. $ 1,096,756.50 4 Dunigan Brothers, Inc. $ 1,119,721.80 5 Anderzack - Pitzen Construction, Inc $ 1,135,829.00 6 Nashville Construction Company $ 1,149,362.14 7 Kamminga & Roodvoets, Inc. $ 1,205,041.87 8 C & G Myers Construction, LLC $ 1,233,286.34 9 Cadwell Brothers Construction Compan $ 1,233,842.46 10 3-S Construction, Inc. $ 1,258,918.27 11 C & D Hughes, Inc. Balkema Excavating, Inc. Aggregate Industries-Central Region Michigan Paving & Materials Co. Milbocker and Sons, Inc. Rieth-Riley Construction Co., Inc. CL Trucking & Excavating, LLC. Hoffman Bros., Inc. Brady Sand & Gravel, Inc. 11 Bidders LETTING OF OCTOBER 03, 2008 ENG. EST. LOW BID PROPOSAL 0810029 $ -21,885.80 $ -65,528.00 PROJECT STE 25031-90351B01 LOCAL AGRMT. % OVER/UNDER EST. START DATE - COMPLETION DATE - NOVEMBER 15, 2008 -199.4 % 1.50 mi of removal and disposal of an abandon railroad corridor including all rail, plates, spikes, hooks, ties, turnouts, other track material, and miscellaneous rubble and debris within the project limits located south of M-21, west of centerline of I-75 in Flint Township, Genesee County. BIDDER AS-SUBMITTED Nagel Construction, Inc. $ -65,528.00 1 ** McDowell Construction , L.L.C. $ -24,313.20 2 CRS/Shaw Contracting Co. $ -21,769.00 3 Tri-Valley Landscaping, Inc. $ 32,202.00 4 Armond Cassil Railroad Construction, $ 57,808.00 5 North American Dismantling Corp. $ 60,988.00 6 6 Bidders LETTING OF OCTOBER 03, 2008 PROPOSAL 0810030 PROJECT M 63113-M70940 LOCAL AGRMT. START DATE - 10 days after award COMPLETION DATE - AUGUST 31, 2009 0.45 mi of hot mix asphalt cold milling and resurfacing, shoulder replacement, culvert repair, and ditch clean out on I-75BL (M-24 Connector) and ramps from the I-75 interchange to the M-24 interchange in the city of Auburn Hills, Oakland County. **ALL BIDS REJECTED. THIS PROJECT IS EXPECTED TO BE RE-ADVERTISED IN A FUTURE LETTING** ------------------------------------------------------------------------------------------------------------------- DISCLAIMER ------------------------------------------------------------------------------------------------------------------- These are preliminary "as read" results, and are not to be considered final until and unless verified by MDOT. This disclosure of bid results represents a disclosure of the Grand Total price appearing on each bid. That Grand Total price is not the price used to determine the low bid. MDOT bases its low bid calculation on the unit and lump sum prices quoted by each bidder. It is not uncommon that a Grand Total price is found to be in error - and under the bid specifications, that error, and the Grand Total price, is disregarded. In addition to errors in the quoted Grand Total price, all proposals are subject to review by MDOT staff to verify compliance with all proposal requirements, and any and all bids are subject to rejection. If a bid is rejected, the bidder may pursueappeals, and those appeals may or may not be successful. For these and other reasons, this public disclosure of Grand Total bid prices does not necessarily identify which bidder will ultimately be determined to be the low bidder. This disclosure is not authorization for any bidder to begin project work of any kind. There is no contractual obligation between MDOT and any Contractor for any work until such time as contract documents have been formally executed by the determined lowest bidder and MDOT -------------------------------------------------------------------------------------------------------------------